WRITER Knowledge Base

What's new at WRITER

Stay up-to-date on new features and major improvements from WRITER.

P.S. Looking for our changelog for API/SDK updates? See here.

November 12th, 2026

Salesforce Marketing Cloud connector now available

The Salesforce Marketing Cloud connector lets WRITER Agent work with Marketing Cloud Engagement journeys, data extensions, and contact data — so personalized email, SMS, and cross-channel content is on-brand and compliant before publish. Admins configure access, connection level, and enabled tools in Control Center, then complete the OAuth authorization flow. Learn more here.

November 11th, 2026

Updated Access & provisioning pages in Control Center

The Access & provisioning page in Control Center has a refreshed interface, with redesigned settings cards across the Access, SSO, and SCIM & IdP groups tabs that make it easier to see what's configured at a glance. Admins can now choose between requiring approval and auto-join with a single control, and locked settings clearly state what unlocks them.

Learn more here:📄 Setting up domain access 📄 Setting up SAML/OIDC SSO 📄 Setting up SCIM provisioning

November 4th, 2026

Figma connector now available

The Figma connector lets WRITER agents access design context, variables, and layouts, and write native content back to the Figma canvas, so creative and marketing teams can generate campaign assets, populate templates at scale, and review designs for brand compliance without leaving their workflow.

October 29th, 2026

Admins can now require approval before a Playbook is shared

Admins can require approval before a Playbook becomes available beyond its owner and collaborators, and each new version must be approved before it reaches other users. This adds a review step before a workflow or update reaches colleagues, while owners and collaborators continue building and testing. Learn more here.

October 26th, 2026

AI Studio is now Control Center

This is more than a new name, it reflects how this part of the platform has evolved and comes with a new navigation to match.

Over the past year, we've brought more of the building experience into the core app. Business users can now create the agentic workflows and outputs they need with natural language, not code or technical workflow builder tools. Business users are building playbooks that automate complex, multi-step workflows; creating live dashboards and microsites; and executing on complex agentic work, all with WRITER Agent, not in a separate builder surface.

At the same time, we've shifted the focus of AI Studio toward governance, giving both business and IT admins the visibility and control they need to understand how WRITER is being used across their org, scale what's working, manage costs, and govern agents.

Control Center as a name better reflects what this part of our platform has become, and what it unlocks for the admins tasked with governing their WRITER deployments.

Note: Updates across the Knowledge Base will be made over the coming weeks.

October 22nd, 2026

Spend notifications now available in Cost Controls

Spend notifications let org admins and business admins create policies that send email and in-app alerts when AI spending reaches a configured dollar amount within a calendar month, making it easier to monitor and manage costs across users, teams, playbooks, and the organization.

Learn more: 📄 Cost controls and spend notifications

October 20th, 2026

Dashboard and HTML deliverable editing now supports area selection and drafts

Users can select one or multiple dashboard areas when chatting to make edits, enabling more targeted and efficient updates. Drafts can now be saved during dashboard editing, allowing changes to be staged and reviewed before being applied. This functionality extends past dashboards and works in HTML deliverables produced by WRITER Agent.

Learn more:📄 Building dashboards

October 15th, 2026

Limited team member role now also restricts skill creation/sharing/export, as well as session sharing. This role previously only restricted playbook creation. Learn more about roles and access controls here.

October 13th, 2026

Built-in Data Loss Prevention (DLP) guardrail now available

The built-in DLP guardrail helps IT admins prevent sensitive information — personal data, financial data, government IDs, healthcare identifiers, and secrets or credentials — from reaching a model by blocking requests before the model call. It runs natively in WRITER with no third-party provider to configure, giving security teams a single, centralized control across teams and models. Learn more here.

October, 2nd, 2026

WRITER MCP is live!

You can now run your WRITER Playbooks, pull deliverables, and bring in your WRITER Meet transcripts and notes from any MCP-compatible client. It works with your same WRITER seat and permissions, and you just sign in with OAuth. Learn more here.

September 30th, 2026

Team library playbooks now show an official badge

Playbooks added to a team's library now display a green check badge in list views, both on the Playbooks page and when selecting playbooks from the prompt box, making it easier for users to identify their organization's official, admin-approved playbooks at a glance. Learn more about managing your team's playbooks here.

September 15th, 2026

Build dashboards in WRITER Agent

Dashboards let you create interactive, shareable data visualizations directly from a conversation with WRITER Agent, pulling live data from connected sources such as connectors, playbooks, and models. Each dashboard generates a durable, shareable link that recipients can open immediately, with your existing data source permissions carried over automatically. Learn more here.

Step approvals now available for playbooks

Step approvals add a human-in-the-loop checkpoint to any playbook step, pausing the run and notifying a designated reviewer for sign-off before the workflow continues. This gives teams a way to automate repetitive work while keeping human judgment at decision points like high-stakes actions, compliance gates, and sensitive access decisions. Learn more here.

September 9th, 2026

Admins can now control who creates and publishes playbooks

Org admins can restrict playbook creation and publishing to designated users through a limited team member role, while other team members retain access to view and run existing playbooks. This opt-in control remains off by default until an admin explicitly configures it.

Learn more: 📄 Controlling who can create and publish playbooks

August 28th, 2026

Take WRITER wherever you work

The power of WRITER, right inside of Slack. Chat with WRITER directly, add it to a channel like a teammate, and kick off real work — sessions, playbooks, and deliverables — without leaving the conversation or waiting until you're back at your desk. Learn more here.

Notifications now available in WRITER

You can now see alerts, tasks, and product updates in a centralized Notifications panel. Notification preferences let each person choose how updates are delivered across in-app, email, and push channels. Learn all about notifications here.

August 18TH, 2026

New customizable home screen tiles

WRITER Home now lets you add, remove, rearrange, and resize tiles so you can organize your workspace around the work that matters most. Three new tiles are available: My work shows your recently accessed files and files shared with you by teammates, Meet gives you one-click access to upcoming meetings and recent notes, and Waiting for you surfaces sessions from the last 30 days that are blocked waiting for your input. Learn more here.

August 10th, 2026

Stop re-teaching AI what good looks like: Introducing Agent Memory

Agent Memory learns your preferences, working style, and the context of your work from their sessions with WRITER Agent, then applies that context to future conversations so you don't have to re-explain yourself. You stay in control with full transparency into what's remembered with the ability to edit or add context, and Incognito mode to pause memory for any session.

Admins can learn more about Agent Memory here, and end users can learn more here.

August 6th, 2026

Our newest model, Palmyra X6, now available!

Palmyra X6 is our general-purpose flagship model — built for agentic work and long-running tasks, engineered for cost efficiency at scale, and delivering frontier-competitive performance. In connection with this update we've also updated our harness and WRITER Agent UX. Learn more about Palmyra X6 here.

WRITER Meet now in open beta!

WRITER Meet lets WRITER Agent join your meetings, transcribe in real time, and generate actionable summaries with decisions and next steps. For administrators, WRITER Meet provides organization-wide controls to manage how the feature is enabled, how transcripts are stored, how summaries are shared, and what participants see when a recording begins. Admins can learn how to enable and configure Meet here, and you can learn how to use it here.

Configure models for WRITER Agent

Admins can now control which models are available to their teams across WRITER Agent. Org admins and IT admins can enable or disable models from WRITER and third-party providers, set a default model, and choose which teams can access each model. Learn more here.

New Customize menu

You can now find skills, connectors, voice, and custom instructions in the Customize menu on the left.

July 30th, 2026

New connectors now available!

Contentful: Connect directly to Contentful — your team's publishing destination for web pages, blog posts, and landing pages — so you can find, read, and update content entries without leaving WRITER. Instead of switching between your AI workspace and your CMS to look up what's live or make copy changes, WRITER works across both.

Wrike:  Extend WRITER across your project management workflows — giving it governed read and write access to Wrike projects, tasks, folders, comments, and approvals so it can plan and execute project work end-to-end, with Wrike remaining the system of record.

Zoominfo: Connect to ZoomInfo's B2B intelligence database, giving sales, demand gen, and revops teams direct access to real-time company signals, firmographic data, and news. Rather than toggling between ZoomInfo and WRITER, account intelligence flows directly into presentation decks, emailed reports, Slack updates, and Salesforce or HubSpot fields.

July 24th, 2026

WRITER Agent session logs and user feedback now available in AI Studio

Admins can now enable WRITER Agent session logs and review user feedback directly in AI Studio, giving them visibility into how their organization is using WRITER Agent and how users are responding to agent outputs. Session records and thumbs-up or thumbs-down feedback can be viewed in-product and exported as JSONL or CSV for offline review. Learn more here.

Analytics for Playbook builders

In the playbook editor, we’ve added a new tab for “Analytics”. Playbook owners and collaborators will now be able to see metrics like runs, active users, and user feedback submitted via the thumbs up/down button.

New Salesforce Connector is LIVE!

Our native, WRITER-built, bi-directional integration is published on AgentExchange. Connect WRITER Agent to Salesforce to query CRM data, manage records, run reports, and automate workflows. Learn more here.

July 13th, 2026

WRITER Agent analytics

The WRITER Agent analytics page answers the most common questions about your AI program: Is adoption growing? Which teams are using it most? How much are we spending? What kinds of work is the agent actually doing?

Learn all about WRITER Agent analytics here.

Playbook reporting and governance: Visibility and control at scale

Playbook reporting and governance gives you dedicated visibility and control over every playbook running in your organization, from the ones your team built to the ones other teams have published.

Learn all about playbooks reporting and governance here.

Skill reporting and governance

Skill reporting and governance gives you dedicated visibility and control over every skill running in your organization. Learn more about skills reporting and governance here.

Consumption data

The Consumption page gives you near real-time monthly usage summaries and detailed cost attribution for your organization, split by user, team, and playbook.

Learn about the Consumption page here.

Our enhanced playbooks experience just hit open beta!

The new playbooks experience introduces a redesigned editor and a set of capabilities that give you greater control over how each part of your workflow runs. You have until early August to upgrade and test your playbooks in the new experience. Once the beta period ends, our team plans migrate all playbooks to this new experience and deprecate the legacy playbook editor. Learn more about the migration here.

Key additions include:

  • Step reordering — Drag and rearrange steps on the canvas without rewriting instructions.

  • Custom voice and instructions per step — Apply a different voice or a tailored system prompt to individual steps.

  • Individual step testing — Test any single step in isolation to verify its output before running the full workflow.

  • Testing with synthetic data — Validate playbook behavior using sample inputs without triggering live data.

  • Reasoning and temperature controls per step — Tune model behavior at the step level to optimize for accuracy, creativity, or speed.

  • Nested playbook calls — Call another playbook from within a step, enabling modular, reusable workflow components.

Learn more about the transition here or get started with playbooks today here.

June 25th, 2026

Admins can now create team playbook libraries!

WRITER now includes the team playbook library to help admins organize and distribute playbooks across their teams. This centralized space provides governance and control over the tools your team uses to automate work. Learn more here.

Pin your most used playbooks to the homepage

Your WRITER homepage is now a personalized hub. Pin the playbooks your team relies on most, the ones built around your core workflows like content production, field marketing, campaign activation, and ABM personalization,  so they are available the moment you log in.

Team administrators can configure a standard set of pinned playbooks for their entire team in AI Studio, ensuring everyone has immediate access to the right tools from day one. Learn more here.

June 22nd, 2026

Webflow connector now available

The Webflow connector is now available in AI Studio. Connect WRITER agents to your Webflow sites, pages, and CMS collections to generate on-brand web copy and publish it directly to Webflow, deploy bulk copy updates across multiple pages and CMS collections simultaneously, and pull live content back into WRITER to audit against brand standards and compliance guidelines, with no copy-pasting or manual reformatting required. To get started, see Setting up connectors or take a look at our comprehensive dev docs here.

June 18th, 2026

Admin can now customize the default WRITER Agent profile

Admins can update the disclaimer language across the org by simply adjusting the default config. For more advanced or particular changes, they can continue to create a custom profile, which will override the default when deployed to a team. Learn more here.

Playbooks can now be pinned to projects

Add playbooks to projects so your project teammates have an easy place to find and use relevant playbooks. Note that any playbooks added to a project will be officially shared with project team members in a view-only role so they can run the playbook.

June 10th, 2026

Export presentations to Google Slides

You can now export WRITER Agent-generated pptx deliverables to Google Slides. This works similar as our Google Drive doc export and OneDrive export options. Your pptx will be added to Google Drive as an editable pptx.

June 5th, 2026

Collaborator role now available for projects!

Select between view only or collaborator access when sharing projects in WRITER.

Admins can now manage presentation themes!

In addition to personal presentation themes, WRITER Agent now comes with team and organization wide themes. Admins can now setup themes for their users to leverage when generating presentations. Learn more here.

May 29th, 2026

Export deliverables to Microsoft OneDrive

You can now export deliverables to Microsoft OneDrive using the same auth flow as MCP connectors. If you’re already connected, just select Export > Save to OneDrive If you’re not connected, you’ll see an OAuth flow pop up.

May 27th, 2026

Semrush connector now available!

You can now connect WRITER directly to Semrush's search platform. Query live keyword research, backlink data, and traffic trends right inside your WRITER Agent workflows to close the loop between search insights and content execution. Learn more about connectors here.

What you can do with the Semrush connector:

  • SEO content research: Identify high-value topics and generate optimized content to close visibility gaps.

  • Data-driven briefs: Pull live keyword and competitive data directly into your drafts—no manual exports needed.

  • Automated monitoring: Run daily scans to get alerted on ranking drops and auto-generate refresh recommendations.

  • Competitive analysis: Investigate traffic spikes and generate intelligence reports for your team.

For full setup details, see out dev docs here.

May 26th, 2026

Team settings have moved!

AI Studio is now your one-stop control panel for WRITER. We've relocated team admin settings to make managing your workspace easier and more centralized.

You can now:

  • Manage your team: Admins can access all necessary settings via the new AI Studio option on the left menu.

  • View team settings: Non-admins also have access to AI Studio to view their team's configuration and settings.

Learn more about team settings and user access roles here.

May 22nd, 2026

Export deliverables to Google Drive

Collaborate on deliverables built in WRITER Agent by sending them directly to Google Drive. This uses the same authentication flow as MCP connectors. If you’re already connected, just select Export > Save to Google Drive. If you’re not connected, you’ll see an OAuth flow pop up.

Playbooks: transfer ownership

You can now transfer the ownership of a playbook you've built to someone else on your team.

Playbooks: bulk export

You can now export playbooks in bulk. This will create a master zip file that can be unzipped into individual playbook zip files. There is a max limit on size of bulk exports - up to1000mb cumulative exports, which is counted by the sum of each individual playbook’s zip file.

May 12th, 2026

Encryption Key Management now available

Control encryption keys for data at rest with WRITER-managed or customer-managed (BYOK) encryption across your organization. Learn more about encryption here or visit our dev docs here.

May 5th, 2026

New and improved WRITER AI Academy!

Head to the WRITER AI Academy to view our new learning experience and our new programs. Some highlights include:

🏆 WRITER Passport: Our comprehensive on-demand WRITER curriculum built to take you from task orchestrator to workflow architect. Show off your AI skills with credentials, which you can share straight to LinkedIn!

🛠 Live workshops: Join our two-part live workshop series to transform how you use AI, shifting from manual, task-based prompting to building scalable, outcome-driven workflows.

🧪 Demo lab: Got 10 minutes or less? Access our demo lab to see how others have automated their workflows with WRITER Agent.

Playbook bulk management

Playbooks can now be bulk shared, tagged, favorited, and deleted. Learn more about automating workflows with playbooks here.

WRITER Agent now supports file uploads up to 500MB!

You can now upload files up to 500MB in WRITER Agent. This support extends across the main chat input as well as playbook and project file uploads, so you can bring larger documents, datasets, and media files directly into your AI workflows. Learn more about file uploads in WRITER Agent here.

WRITER Agent can now transcribe audio and video files.

Upload a recording and ask for a summary or transcription, WRITER will transcribe the content on the fly, no separate workflow required. Supported audio formats include mp3, wav, m4a, webm, ogg, flac, and amr; supported video formats include mp4, webm, QuickTime, avi, mkv, and flv. Files up to 500MB are fully supported, and any file above that limit will be automatically transcribed rather than uploaded directly to the agent's sandbox. Learn more about WRITER Agent here.

April 29th, 2026

Style guide suggestions are now applied to AI outputs!

You can now connect your style guide to team voices to automatically apply suggestions when generating outputs in WRITER Agent and custom agents. Learn more about suggestions here and voices here.

April 28th, 2026

New event based triggers now available!

Automate your workflows based on actions completed in Gong or Microsoft Sharepoint. Learn more about event-based triggers here.

Organize your playbooks with tags.

Learn all about organizing playbooks here.

April 23nd, 2026

Organization settings now in AI Studio

We've moved organization-level settings into AI Studio for a more unified management experience. This change streamlines how admins configure WRITER across teams, bringing all your AI governance, model selection, and organizational controls into one central location.

You'll find your organization settings under the AI Studio section, where they sit alongside your other AI configuration tools like agent profiles, connectors, and model management. This consolidation makes it easier to maintain visibility and control over your entire WRITER deployment.

April 22nd, 2026

Google Drive connector

Connect WRITER Agent directly to your Google Drive to access and work with your team's documents, spreadsheets, and presentations. The Google Drive connector enables agents to search across your Drive content, retrieve specific files, and incorporate information from your existing documents into AI-powered workflows.

With this connector, you can ask WRITER Agent to summarize documents stored in Drive, pull data from spreadsheets, or create new content based on existing Drive files—all without leaving your workflow.

Adobe Experience Manager connector

The Adobe Experience Manager (AEM) connector brings your enterprise content management system directly into WRITER Agent. Access digital assets, retrieve content fragments, and leverage your AEM-stored content within AI workflows. This integration helps content teams maintain consistency while accelerating content creation and management processes. Learn more here.

April 17th, 2026

Configure custom WRITER Agent profiles for different teams

IT admins and org admins can now create customized versions of WRITER Agent tailored to specific teams within your organization. With agent profiles, you control which capabilities are available, customize the interface, and configure settings to match different team workflows, all from AI Studio.

Deploy different Agent experiences across your organization while maintaining centralized control. Customer success teams can have access to Knowledge Graphs and web search, while research teams might use browser automation and image generation. Each profile maintains the full power of WRITER Agent while giving you granular control over what each team can access.

What you can do with agent profiles:

  • Create team-specific configurations with the exact capabilities each team needs

  • Customize greetings, placeholder text, and disclaimers for different use cases

  • Pre-configure Knowledge Graphs and custom instructions to embed best practices

  • Control security settings like public sharing on a per-profile basis

  • Choose from "Fully loaded," "Conversational," or "Custom" starting templates

  • Deploy the same profile to multiple teams for consistent configurations

Perfect for organizations that need to balance flexibility with governance, agent profiles help you scale WRITER Agent across teams with different workflows, security requirements, and collaboration needs.

Learn more about configuring WRITER Agent profiles here.

April 3rd, 2026

Custom presentation themes now available in WRITER Agent

file-G1KTWJi5hj.png

Upload a slide template to show WRITER Agent the right brand colors, fonts, and slide formats. Then ask WRITER Agent to generate a presentation, and sit back as it turns content or ideas into an on-brand, editable PowerPoint. Learn more here.

April 1st, 2026

Updated My Work page now available!

With the revamp of My Work, now all your WRITER-generated outputs are in one place and easy to organize, edit, share with colleagues, and reference in future projects or sessions. Learn more about managing deliverables created with WRITER Agent here.

March 25th, 2026

Observability event logs, plugins, and Datadog are now live!

  • Observability event logs:  You can now see all of your LLM request and response, latency, and token usage for all of your AI Studio traffic in one place (no-code, Agent Builder, API/SDK). View for the last hour, multiple days, or even months back.  As part of this feature, you can configure whether to hide the request and response content in case sensitive information is involved. This is enabled by default.

  • Plugins: The new plugins page is our home for all of our new observability and security integrations

  • Datadog integration: You are now able to export your observability event logs into Datadog.

March 19th, 2026

Lite seats: A simpler way to roll out WRITER access

WRITER now supports Lite seats, allowing additional users in your organization to access WRITER at no additional cost. You can now enable Lite seats through domain discoverability settings or when inviting users manually. Learn more about Lite seats here.

March 16th, 2026

Playbooks can be shared with “collaborator” access

We’ve added a new type of share access called “collaborator”. Collaborators can view, use, duplicate, and edit playbooks but cannot delete them. Learn more about sharing playbooks here.

March 13th, 2026

Better enforce brand guidelines with our latest update to terms

You can now connect termbanks to team voices to automatically ban words and better enforce brand guidelines! Learn more about terms here and voices here.

Connector profiles now available

Having multiple connector profiles allows you to connect WRITER to multiple instances of the same tool, or maintain different configuration options for different profiles of the same tool. Learn more about connectors here.

March 11th, 2026

Skills are now available for WRITER Agent! Skills are reusable capability packages that extend what WRITER Agent can do . Think of them as specialized toolkits that give the agent expert knowledge and workflows for specific tasks.

WRITER Agent now comes with 200+ official skills out of the box , covering everything from document processing to industry-specific workflows. Even better, you can create and share custom skills for your unique business needs. Learn more here.

February 23rd, 2026

Organize WRITER Agent sessions with projects

We're excited to introduce projects, a powerful new way to organize your WRITER sessions and ensure consistency across your team's work!

Projects act as smart folders that not only keep your sessions organized but also apply pre-configured settings automatically. Create a project once with your preferred context files, voice settings, and custom instructions, and every session you start from that project inherits those settings automatically.

What you can do with projects:

  • Organize sessions under projects to keep related work together in one place

  • Pre-configure files so they're automatically added to every new session

  • Set voice preferences that apply to all sessions in the project

  • Create custom instructions that guide WRITER's responses for specific use cases

  • Share projects with teammates so everyone can use the same standardized configurations

  • Pin frequently used projects to your sidebar for instant access

Perfect for:

  • Department-specific configurations with brand guidelines and relevant files pre-loaded

  • Client-specific setups with custom context and instructions

  • Recurring task templates for weekly reports or content creation

  • Team collaboration with standardized settings

Learn all about projects here.



Routines are now triggers

We’ve renamed Routines to triggers to better reflect how you automate your workflows. You can now configure schedule-based triggers to automatically run your playbooks on a recurring schedule daily, ensuring your workflows execute precisely when needed. Learn about schedule-based triggers here and event-based triggers here.

February 20th, 2026

Playbook version control

Iterate with confidence using our new version control for playbooks. You can now track edits, view version history, and restore previous versions of your playbooks directly in AI Studio, making it easier than ever to manage updates and collaborate with your team. Learn more here.

Asana connector now available

The Asana connector in WRITER lets WRITER Agent access available workspaces and team members, create, read, update, and delete tasks and subtasks, and retrieve task details, comments, dependencies, and project structure — enabling AI-driven task creation, project summaries, and workload insights.

Learn more about connectors |  Visit our dev docs for full details

February 18th, 2026

You can now connect NVIDIA NIM to AI Studio to power your agents with NVIDIA’s latest foundation models. This integration supports both cloud-hosted models via the NVIDIA API Catalog and self-hosted NVIDIA Inference Microservices (NIM) deployments. Learn more here.

February 17th, 2026

We've made WRITER Agent more powerful!

Deliverables created in agent mode now include citations. Select the sources button in the deliverables header to expand the panel on the right to access the sources WRITER Agent used to produce your deliverable. When you download a deliverable, you’ll have the option of including or excluding citations and if you’d prefer sources not be included as inline citations in the deliverable itself, simply ask the agent to remove them. Learn more about WRITER Agent here.

When creating presentations you will now see an edit button on each slide allowing you to update a single slide without having to regenerate the entire presentation. Learn more about creating presentations in WRITER Agent here.

You can now execute playbooks outside of WRITER with webhooks. Learn more here.

February 10th, 2026

Introducing playbook showcase

Get started with popular playbook templates you can customize in just a few minutes. Browse example playbooks built around core use cases, see them in action with replay demonstrations, and test them with your own inputs to explore what's possible.

The playbook showcase makes it easy to:

  • Discover pre-built playbook examples for common workflows

  • Watch replays to see how playbooks work end-to-end

  • Test playbooks with your own data before building your own

  • Learn best practices for structuring effective playbooks

Whether you're new to playbooks or looking for inspiration for your next automation, the showcase helps you explore proven workflows and jumpstart your productivity.

Access the playbook showcase directly from the Playbooks section in WRITER.

January 22nd, 2026

Custom connectors are available now!

Writer - Action Agent Workflow GIF - V1 Looped.gif

Custom connectors securely connect any external system to WRITER from an API spec.

Learn more about custom connectors |  Visit our dev docs for full details

January 15th, 2026

Enhanced Voice profiles 

We've enhanced voice with comprehensive editing capabilities, making it easier than ever to refine and iterate on your brand voices. 

What's new:

  • Easily create voices from unlimited examples: provide as many content examples as you want, without character limits, and WRITER will reverse-engineer your voice automatically.

  • Create voice from description: you now have the option to skip the examples stage and paste or edit a voice description directly.

  • Test and refine until it’s right: test out how a new voice performs and make edits to the voice profile as you go. Iterate on your voices as your brand evolves.

We’ve also upgraded voice performance under the hood for both agent outputs and human writing assistance, helping you scale compliant content across your team without endlessly customizing prompts.

Learn more about voice calibration

January 8th, 2026

Databricks and Snowflake connectors now live!

Admins can now connect WRITER Agent to securely access and act on data across Databricks and Snowflake via our proprietary Model Context Protocol (MCP) gateway.

Learn about managing WRITER Connectors here.

  • Databricks: The Databricks connector lets WRITER agents use natural-language queries to run Databricks SQL and ML workloads, interact with Unity Catalog tables, create and manage data pipelines, and execute models. Agents can explore, transform, and operationalize governed data directly from Databricks.

  • Snowflake: The Snowflake connector in WRITER lets agents translate natural-language queries into Snowflake calls across Cortex tools (Analyst, Search, Agent), SQL operations, object management, and Semantic Manager functions for querying semantic views, dimensions, and metrics.

December 18, 2025

Playbooks just got a whole lot better!

Our team is excited to bring you our updated playbooks functionality for WRITER Agent. You can now generate a playbook with just an idea, test and iterate on the playbook, share it with teammates, and more! Learn about our updated playbooks here.

Updated navigation menu

To streamline and organize sessions, projects, and settings our team has released a slight update to our main navigation. You’ll now find AI Studio along the top left. Expand the menu in the bottom left to switch between teams or access WRITER settings, learning center, and help center. 


December 2, 2025

Guardrails and Amazon Bedrock integration: More model choice, unified governance

You can now use models from Amazon Bedrock to power your WRITER agents while maintaining centralized visibility and control across your entire AI ecosystem.

Use Bedrock models in WRITER

Configure WRITER agents to use models available through Amazon Bedrock alongside Palmyra models. This gives you the flexibility to use specialized or custom-tuned models for specific use cases while managing everything from a single platform.

Learn more about using Bedrock models in WRITER

Integrate Bedrock Guardrails

Already using Amazon Bedrock Guardrails? Connect them directly to WRITER to apply your existing safety policies across all your agents without duplicating configuration. This maintains consistent governance across your entire AI stack.

Learn more about Bedrock Guardrails integration

For IT admins: Centralized model management

Manage model selection and access from AI Studio. View and enable models from Bedrock alongside Palmyra, control which teams can access specific models, and monitor usage and costs from a unified dashboard.

Learn more about model management in AI Studio | View developer documentation


November 17, 2025

Introducing the new WRITER Agent: A unified, powerful interface for productivity at scale

We’re thrilled to announce the launch of the new WRITER Agent, a single, intelligent interface that combines the conversational power of Ask WRITER with the advanced automation of Action Agent. Whether you're brainstorming ideas, analyzing data, or automating complex workflows, WRITER Agent is designed to help you work smarter and scale your best work across the enterprise.

Learn all about using WRITER Agent here.


For End-Users: Meet your new creative and analytical partner

WRITER Agent is built to adapt to the way you work, with two distinct modes to match the complexity of your tasks.

Chat Mode: For quick, conversational tasks

Your familiar Ask WRITER experience is now Chat mode. It’s perfect for brainstorming, drafting content, summarizing documents, and getting quick answers from your Knowledge Graph.

Agent Mode: For complex, multi-step projects

When you need to tackle a bigger project, switch to Agent mode. Here, WRITER Agent can work autonomously to achieve your goals. It can browse the web, analyze data, and crate deliverables like presentations, reports, and even websites.

Key new features for you:

  • Playbooks: Save your most-used prompts as reusable Playbooks to automate recurring tasks.

  • Routines: Schedule Playbooks to run on a daily, weekly, or monthly basis, so your reports are ready when you are.

  • Enhanced Canvas: Iterate on your generated content in an interactive workspace with enhanced editing capabilities.

  • Personalization: Customize WRITER Agent’s personality with different voices and custom instructions to ensure the output is always on-brand and in your desired style.


For Admins: Govern and scale with new admin controls

We’ve added powerful new controls in AI Studio to help you manage how WRITER Agent is used across your organization, ensuring security and compliance. Learn about managing WRITER Agent here.

New in AI Studio: Capabilities

Under Connectors & Tools, you’ll find a new Capabilities tab where you can manage the following features:

  • Browser Automation: Enable or disable the agent's ability to navigate websites. You can allow access to all sites, or restrict it to specific domains to ensure the agent only interacts with approved sources.

  • Web Search: Control the agent's web search scope. Allow it to search the entire web, or limit it to a curated list of websites.

  • Website Hosting: Manage the agent's ability to temporarily host deliverables on a shareable URL.


For Admins: Connect your enterprise stack with ease

Our new Connectors allow WRITER Agent to securely access and act on data across your enterprise applications. Powered by our proprietary Model Context Protocol (MCP) gateway, you can easily integrate with tools like Google Workspace, Salesforce, Slack, and more.

Setting up and managing connectors:

  • Connector Library: Browse our growing library of connectors in AI Studio and enable them for your organization.

  • Granular Permissions: Control which users and teams have access to each connector.

  • Tool-Level Control: For each connector, you can enable or disable specific tools (e.g., allow reading from a source but not writing to it).

Learn about managing WRITER Connectors here.

We're excited to see what you'll accomplish with the new WRITER Agent! As always, please don't hesitate to reach out to our support team with any questions.


October 24, 2025

Updated AI Studio interface

Our team is working on some exciting changes to make managing WRITER Agents at scale a breeze. In a small step towards these enhancements our team has released an update to the main navigation menu on the left.

October 3, 2025

Introducing the Control Panel for Knowledge Graphs

Today we're releasing Control Panel for Knowledge Graph — a single place to govern, secure, and scale your enterprise knowledge sources. 

With it, you can:

  • Take bulk actions across your Knowledge Graphs

  • Manage your team’s access with confidence

  • Get unified visibility from one dashboard

Where to find it:

Knowledge Graph management has moved from WRITER Home to: AI Studio → Control Panel → Knowledge Graph. You can also click here.

If you don’t already use AI Studio, you’ll now see it in your side nav with access to your Knowledge Graph control panel only.

For more information, check out our support article here.

September 19, 2025

New roles and permissions – now including customization!

We've completely revamped our roles and permissions structure, to offer greater granularity and control. With custom roles and a role-based access control system, you can precisely control who can configure key features like Knowledge Graphs and agents while improving security and scalability across your workspace.

We launched:

  • 8 new default custom roles offering roles and permissions which align to different stakeholders in your organization

  • The ability for enterprise plan accounts to create custom roles and offerings, providing the exact permissions and access scope to fit your needs.

Existing Writer users have already been migrated to their new corresponding default roles. Org admins can reassign roles and create custom roles in our new, consolidated Users page here.

Learn more about our new roles and permissions system here.

August 21, 2025

Ask WRITER updates

We've released a few important updates to Ask WRITER:

  • 🖼 Image analysis - Upload a JPG or PNG file (with Palmyra X5 model selected) and ask questions or chat against them.

  • 📊 Improved CSV handling - Ask WRITER can provide more accurate and comprehensive responses against XLSX or CSV filetypes, including complex data analysis use cases.

  • 🏡 Ask WRITER home screen - (Team and org admins only) Select Customize, then select the toggle to make Ask WRITER the default home screen for your team or org.

August 18, 2025

Default voice in Ask WRITER

A team's default voice will now be applied by default in Ask WRITER. Change the voice at any time by going to Custom Instructions > Voice to select an alternate option.

August 11, 2025

Send to canvas in Ask WRITER

Love working with our canvas feature in Ask WRITER? Select Send to canvas under any output to generate a canvas and iterate on your work more easily.

August 1, 2025

Inline citations for Knowledge Graph chat

Ask WRITER and Knowledge Graph chat agents now offer inline citations, so you can see precisely where and how sources contributed to your output.

Hover over the inline citation to display the contributing file name, page number, and snippet.

To see and download the files, select View sources.

Learn more about using Knowledge Graph in Ask WRITER here.

July 29, 2025

Introducing Action Agent: your new digital coworker

What if every employee could deploy a powerful agent to handle tasks – on demand?

WRITER's Action Agent is now in open beta! 🚀

Click here to access Action Agent.

Action Agent is your trusted partner in completing complex, multi-step knowledge work – from turning data streams into dashboards to updating your entire sales pipeline.

Find out how you can reduce your time-to-action from weeks to minutes: How to use Action Agent

July 25, 2025

Two new prebuilt agents

New prebuilt agents are now featured in a New from WRITER section within the Agent library.

July 24, 2025

Ask WRITER updates

🧠 Smart routing - If you ask a question for which web search is needed (e.g. "Summarize today's news"), Ask WRITER will automatically route to web search.

🎙Voice dictation - Voice dictation is back! Tell Ask WRITER exactly what you want, no keyboard necessary.

🗺 Global nav menu - Jump from Ask WRITER to any other part of the WRITER platform, and vice versa.

Check it out in Ask WRITER.

July 22, 2025

View exact sources within Ask WRITER files

When you select View sources within Ask WRITER, and select a specific source tile, the document preview modal will scroll to the relevant passage used in the output and highlight it in green.

July 17, 2025

An upgraded SSO & SCIM system

We've overhauled our SSO & SCIM support to:

  • Provide first class support for all IdP providers

  • Unlock the ability for orgs to share an SSO connection across 2 orgs with the same domain

  • Add support for IdP Group Mapping to allow IdP groups to map to team/role combinations flexibly

  • Refresh the UI for ease of setup

Learn more in our documentation:

Upgrade to our Suggestions found report

Our Suggestions found report has been rebuilt for added stability and improvements including:

  • Ability to download the visible table as a .csv

  • More streamlined suggestion categories

  • Ability to view suggestion sub-categories in the table

Learn more about our updated report here.

July 15, 2025

Introducing the Agent Template Library!

Users in AI Studio can now use our prebuilt agents as templates to build on with their own modifications! From the AI Studio home page, select Build an agent in the top right corner. Then scroll through our template library, find the prebuilt app you'd like to customize, and select Use.

July 9, 2025

Enhancements to Ask WRITER

  • Use the new copy icon to copy a prompt for easy reuse. (If you want to store a prompt for long term reuse, add it to your personal prompt library.)

July 7, 2025

Enhancements to WRITER for Figma

We've improved our WRITER for Figma extension:

  • Applies suggestions to tables in FigJam

July 3, 2025

Our User Activity report got an upgrade

Track how your users are engaging with AI agents through content generation, with a focus on user-level adoption and behavior, using our new user activity report.

June 30, 2025

Introducing the new Ask WRITER

Ask WRITER, your enterprise-grade assistive agent, now comes with more power, more control, and more ways to get work done‌ — ‌all grounded in the right knowledge.

Check out the most important new features in under 60 seconds:

Learn more about the new Ask WRITER by reading our Help Center article here, or registering for our July 17th webinar here.

June 25, 2025

Two new prebuilt agents

  • SDR outreach: Generate personalized outreach emails tailored to a target account. This agent combines prospect research with product positioning to craft a high-impact, multi-email sequence that aligns with the prospect’s business priorities and challenges.

  • Content lifecycle: Transform a single campaign brief into a fully built, ready-to-launch campaign. This agent extracts goals and summaries, generates project tasks, creates copy and visuals, and runs the final content through customizable legal checks, streamlining every step of the marketing content supply chain.

Access each of these in the Agent Library.

June 13, 2025

Five new prebuilt agents

  1. Prospect research assistant

  2. Prospect outreach email sequence

  3. Infographic text

  4. Follow-up email

  5. ABM landing page

June 12, 2025

Accept and ignore suggestions in bulk

When WRITER suggests the exact same change at multiple locations in the same document, you can accept or ignore all of those suggestions at once.

Just want to accept one suggestion at a time? Select the highlighted replacement word (e.g. select "changing" in the screenshot above).

Select the dropdown menu next to the trash can to ignore a single suggestion, or ignore all identical suggestions at once.

Learn more about using suggestions here.

June 10, 2025

Add a custom logo to your WRITER workspace

Enterprise customers can now add a custom logo to their workspace. The custom logo will show up across the WRITER landscape, from Ask WRITER to custom agents.

To add a custom logo, org admins can go to Account settings here.

June 6, 2025

Meet the new Prompt library – now with personal prompts!

Our popular Prompt library has received a major upgrade! What's new?

  • New Personal prompts section to save your favorite prompts for easy access

  • Tag-based sorting to surface the right prompts faster

  • Admin prompt download for easier backup & analysis

  • Fresh UI polish / reskin for a cleaner, more intuitive experience

Learn more about using the Prompt library here.

Five new prebuilt agents

  1. Job candidate report

  2. Video script

  3. Customer review responder

  4. Leader social media content

  5. Pre-webinar engagement kit

June 5, 2025

Create a Knowledge Graph out of trusted websites

Build Knowledge Graphs from publicly available web content, curated by you! The KG web connector:

  • Enables adding up to 20 URLs/domains in beta

  • Supports searching full domains/directories

  • Supports both full domain and single page indexing

  • Works alongside existing Knowledge Graph content

  • Allows for single page or subdirectory exclusion

Learn more about setting up a Knowledge Graph web connector here.

May 30, 2025

Five new prebuilt agents

  1. Podcast outline

  2. Welcome email

  3. Campaign brief

  4. Spanish translation

  5. Derivative social media content

May 28, 2025

Personalized WRITER AI Academy widgets in WRITER Home

Users will now see AI Academy content specific to their roles and industries on WRITER Home! It's easier than ever to onboard users to their most relevant use cases in WRITER - no admin configuration necessary.

May 23, 2025

Four new prebuilt agents

  1. Presentation slides

  2. Meta title and description

  3. Listicle

  4. Customer story

Learn more about the Agent Library here.

Greater Knowledge Graph control in AI Studio

You can control exactly which Knowledge Graphs your users can access through a chat agent, and prevent users from downloading source files.

May 16, 2025

Four new prebuilt agents

  1. Webinar outline

  2. Crisis communication statement

  3. SEO content refresh

  4. Photo post caption

Learn more about the Agent Library here.

May 9, 2025

Five new prebuilt agents

  1. ABM email campaign

  2. Customer review summaries

  3. Content improvements

  4. Sales call Q&A

  5. Help center Q&A

Learn more about the Agent Library here.

Session logs for all AI Studio agents

Org admins can enable session logs for all agent types over specific periods of time: custom agents, prebuilt agents, Ask WRITER, and more. Org admins can view conversational history between the agent and the user, review responses flagged by users, and monitor agent activity for quality assurance, compliance, and risk. Learn more in our developer documentation here.

May 2, 2025

Five new prebuilt agents

We've added five new high-powered prebuilt agents to our Agent Library! Check them out below:

  1. White paper outline

  2. E-book outline

  3. Speaker bio

  4. Thought leadership article

  5. Content brief

Learn more about the Agent Library here.

April 24, 2025

Update your industry and role in WRITER

On the heels of our major launch of the Agent Library on April 10th, you can now adjust your industry and role within WRITER! This means we'll surface the most relevant agents in our Agent Library, and recommend the most useful WRITER AI Academy content to you in WRITER Home.

Update your industry and role information in your profile settings.

April 22, 2025

Session logs for no-code apps

Get visibility into your organization's agents to monitor their performance over time. Org admins can enable session logs for specific no-code agents over specific periods of time. Org admins can view conversational history between the agent and the user, review responses flagged by users, and monitor agent activity for quality assurance, compliance, and risk. Learn more in our developer documentation here.

April 11, 2025

Knowledge Graph conversational history

Knowledge Graph now remembers up to 5 previous conversational inputs, making it easier to go back and forth to get the information you need, without losing any context.

April 10, 2025

Welcome to your AI HQ

Welcome to AI HQ, your new home for agents.

We're introducing a new way to automate complex work with AI agents that can reason, plan, and take action.

What's new?

Expanded Agent Library

Get up and running fast with 100+ agent templates built for real-world workflows.

  • Curated collections for different industries and roles

  • 40+ super-powerful new agents

  • Recommended agents chosen just for you

Learn more here, or visit the Agent Library.

Agent Builder (beta)

Build agents that can take action across your tools and systems using our low-code builder.

  • Collaborate with business teams to build advanced, multi-agent systems which can search, analyze, and take action across internal data and tools.

  • Use our new low-code Agent Editor to connect different systems and unique data sources in minutes.

Sign up for the beta.

Agent observability

Enforce policies, monitor performance, audit behavior, and troubleshoot agents at scale from one central command center.

Learn more about observability here.

Learn more

With WRITER HQ, it's easier than ever to build, customize, and use more powerful agents that are connected to your data and built for how you work.

Learn more in our blog post.

March 12, 2025

Writer for Mac & Windows: now with full Agent access & home page!

Our Writer for Mac and Writer for Windows desktop apps just got a major update!

Our new desktop experience offers instant access to all the generative AI features and new functionality you've enjoyed over the past year, including:

  • A home page featuring easy access to your most-used features – any agent customization will carry over to the desktop experience!

  • Access to the entire Writer agent library, including custom agents

  • "Always on top" toggle to overlay Writer over all your other desktop agents

  • Send screenshots to the image analyzer agent

  • Recently used Writer agents are automatically pinned for easy reuse

How do I access the newest version of my desktop app?

Go to the Extensions page to download the newest versions of the desktop apps.

Users with the Mac app installed do not need to take further action. The app will auto-install the update.

Users with the Windows app will need to re-install the app at the Extensions page above.

March 6, 2025

Sync to another team's snippets

You can now sync snippets across multiple teams, the same way you can sync terms and suggestions. Learn more about syncing snippets here.

February 18, 2025

Welcome to the new Writer Home experience!

Writer just got a whole new look! The new Writer Home page makes it easier to access your most-used apps, drafted content, and key Writer features, all in one place. New updates include:

  • Pin up to 10 shortcuts to your favorite apps and features

  • Jump back into sessions, docs, or agent outputs (previously called "drafts") in the new My Work tab

  • Access Ask Writer or any favorite chat agent right away

  • (Org admins & team admins) Customize your Home page layout for your team!



Learn more about configuring a Home page for your team in our Help Center article here.

Learn more about navigating the Home page in our short video here.

Check out your new Home page experience!

February 6, 2025

Using Recaps to transcribe and summarize videos? We can now transcribe videos in a much wider variety of languages! Whether you're reviewing a sales call in Slovenian or a training call in Telugu, Writer will transcribe the video in that language and produce a downloadable transcription in that language. Recap outputs will continue to be written in English. Learn more here.

November 26, 2024

Writer suggestions are now better than ever! With our new model updates, you'll get your content publication-ready faster than ever:

  • Faster and accurate:

    • Better at detecting gibberish, split/merged words, use of incorrect words

    • capitalize proper nouns, adjectives when appropriate

  • Domain-specific:

    • Broader knowledge of industry-specific terms

  • Customizable:

    • Set context-specific casing rules to match your organization's style preferences

  • Continually improving:

    • New system updates driven by customer feedback and bug reports

November 13, 2024

Track system-level activities to maintain transparency and control. Our new Admin audit log report creates a centralized record of all system-level activities, including:

  • Configuration changes

  • User management updates

  • Security-related activities

Learn more about the Admin audit log report in our Help Center article here or view your own report here.

November 7, 2024

Keep track of changes with document version history

Feeling nostalgic for the way things were? Now you can restore previous versions of your Writer docs! From the ••• menu, select Version history to bring up previous versions of your doc:

You'll be able to view any versions of your doc from the previous 30 days. Select a version and select Restore to overwrite your current doc version – this is irreversible!

October 28, 2024

Monitor your teams' generative AI usage in Writer

With the new AI Usage report, you'll be able to track 3 different metrics over time: words generated, recaps transcribed, and words rewritten. See how activity varies across or within teams, identify usage patterns across different features and surfaces, and group or filter your data to find the exact information you're looking for. Learn more about the AI usage report in our Help Center article here or view your own report here.

October 10, 2024

Grow your AI expertise with the new Writer AI Academy

Exciting news! We've just launched Writer AI Academy – your go-to hub for becoming an AI expert. 🎉

Here's what's in store:

🏆 Power User Certification: Ready to become a Writer pro? Our new certification will test your knowledge and demonstrate your AI aptitude. Show off your skills with a certificate, which you can share straight to LinkedIn!

🎬 Quick Tips: Got a few minutes to spare? Our bite-sized videos are perfect for quick learning. Packed with practical tips and real-world examples, they'll help you make the most of Writer.

📺 On-Demand Courses: Learn at your own pace with our course library. Whether you’re getting started with Writer, learning how other teams like yours use AI, or even building your own AI apps, we’ve got you covered. 

Enroll in the Writer Academy here.

October 9, 2024

Introducing tool calling with Palmyra X 004

With the release of our new, top-ranking LLM, Palmyra X 004, we're releasing a suite of powerful new features and capabilities, including:

  • The ability for the LLM to take action in external systems, like software, databases, and other Writer apps via tool calling

  • Automatic data integration with built-in retrieval augmented generation (RAG), including chain-of-thought and source transparency

  • Code generation and deployment

  • An expanded 128k context window

Learn more about tool calling, and how you can use custom apps to build sophisticated workflows with your existing tech stack, in our engineering blog post here.

Palmyra X 004 is available today in Ask Writer and AI Studio.

September 18, 2024

Access the Learning Center within Writer for Chrome

Stay on top of our latest product updates and grow your Writer expertise!

Under your Settings menu, you're now able to open the Learning Center or this What's New page directly.

September 17, 2024

Introducing Writer for Slack

Your AI apps are just a Slack away with our new Writer for Slack extension!

Connect to your organization's custom chat apps for enhanced team collaboration and productivity.

  • Use general mode to query against an agent's training data – whether it's our flagship model Palmyra X 004, or a specialized model like Palmyra-Med or Palmyra-Fin

  • Use Knowledge Graph mode to query against your organization's trusted data for deep insights and informed decision-making

The Writer for Slack extension unlocks the power of custom AI apps built in AI Studio as well as those built by the Writer team. Draft content, pull insights, and even drive decision-making processes directly in Slack!

Note: This is a premium feature which charges usage-based fees. Learn more about the pricing here.



August 2, 2024

Voice dictation now available in Writer for Mac extension

  • Thought process shows the steps Ask Writer takes to answer your question, and highlights the specific excerpts from contributing sources which were used.

  • Dictation: Use spoken commands to make requests.

July 28, 2024

Ask Writer modes update now available in Writer for Chrome extension

Access our newest, superpowered Ask Writer update anywhere!

We've added 3 "modes" – dedicated user experiences designed for specific types of tasks:

  • General mode provides on the fly assistance from Writer built LLMs to ideate, generate text, or get quick answers on general knowledge

  • Document mode helps you go deep on research or draft content based on a few specific files that you upload

  • Knowledge Graph mode allows you to ask questions directly from your most trusted company data

Other Writer for Chrome app updates include:

  • Thought process shows the steps Ask Writer takes to answer your question, and highlights the specific excerpts from contributing sources which were used.

  • Upload up to 10 million words of source data – the equivalent of 20,000 pages – and ask questions, conduct research, or generate outputs. Dive deep into lengthy documents like 10-Ks, legal contracts, research papers, product manuals, and more.

  • Custom instructions let you tell Ask Writer how you'd like it to behave, including specific formatting, style, voice, do's and don'ts, languages, and more.

  • Dictation: Use spoken commands to make requests.

July 22, 2024

Rewrite with a voice profile in Writer for Mac

Love your Ask Writer output but need to make it sound a little more...you? Skip sending your output to a doc for polishing! Using the Writer for Mac extension, you can just rewrite it with a voice profile within Ask Writer!

July 18, 2024

Ask Writer modes update now available in Writer for Mac extension

Access our newest, superpowered Ask Writer update anywhere!

We've added 3 "modes" – dedicated user experiences designed for specific types of tasks:

  • General mode provides on the fly assistance from Writer built LLMs to ideate, generate text, or get quick answers on general knowledge

  • Document mode helps you go deep on research or draft content based on a few specific files that you upload

  • Knowledge Graph mode allows you to ask questions directly from your most trusted company data

Other Writer for Mac app updates include:

  • Thought process shows the steps Ask Writer takes to answer your question, and highlights the specific excerpts from contributing sources which were used.

  • Upload up to 10 million words of source data – the equivalent of 20,000 pages – and ask questions, conduct research, or generate outputs. Dive deep into lengthy documents like 10-Ks, legal contracts, research papers, product manuals, and more.

  • Custom instructions let you tell Ask Writer how you'd like it to behave, including specific formatting, style, voice, do's and don'ts, languages, and more.

July 17, 2024

Improved readability suggestions – now with full sentence replacements

We've made suggestions better than ever. We won't just flag sentences which need a little help with clarity, readability, or complexity; we'll offer a full sentence replacement for you!



Admins, we've made it easier to configure readability suggestions. Choose between Simple, General, or Advanced to polish your team's writing for the appropriate audience.

July 10, 2024

Introducing Ask Writer modes: optimized for the way you work

We've just supercharged Ask Writer, our most popular prebuilt agent, with a set of new capabilities.

We've added 3 "modes" – dedicated user experiences designed for specific types of tasks:

  • General mode provides on the fly assistance from Writer built LLMs to ideate, generate text, or get quick answers on general knowledge

  • Document mode helps you go deep on research or draft content based on a few specific files that you upload

  • Knowledge Graph mode allows you to ask questions directly from your most trusted company data

That's not all! We've introduced other features to make Ask Writer more accurate, transparent, and easy to use. These features include:

  • Rewrite responses in your own voice! No need to Send to doc every time you want to polish Ask Writer output to sound more like you. Use your team's voice profiles to rewrite an Ask Writer output.

  • Upload up to 10 million words of source data – the equivalent of 20,000 pages – and ask questions, conduct research, or generate outputs. Dive deep into lengthy documents like 10-Ks, legal contracts, research papers, product manuals, and more.

  • Thought process shows the steps Ask Writer takes to answer your question, and highlights the specific excerpts from contributing sources which were used.

  • Custom instructions let you tell Ask Writer how you'd like it to behave, including specific formatting, style, voice, do's and don'ts, languages, and more.

  • Dictation: Use spoken commands to make requests.

June 26, 2024

Accept replacements for Clarity suggestions – fix passive voice & wordy sentences in one button!

Have a habit of slipping into passive voice? Tend to write sentences which are a bit too wordy for your target audience? Now, Writer won't just flag those sentences for improvement – we'll offer a replacement sentence! Clear, straightforward writing is only a click away.

June 7, 2024

Bulk accept & bulk ignore suggestions in Figma

Accidentally misspell the name of your company in 47 places across 5 different frames? Don't worry - Writer for Figma can now detect identical issues and allow you to accept each suggestion individually or all at once. You can also ignore a suggestion individually or ignore multiple identical issues all at once.



June 5, 2024

Introducing AI Studio: the fastest way to build AI apps and workflows!

We’re excited to introduce Writer AI Studio: the fastest way to build AI apps and workflows. With AI Studio you get access to suite of development tools that make it easier than ever to build and deploy AI apps on the Writer full-stack generative AI platform.  

Our new studio has tools for any builder and every workflow:

✅ No-code tools for business users to build apps that automate tasks, generate assets, or answer questions on company data.

✅ Writer Framework, an open-source framework with a visual editor and extensible Python backend for building feature-rich AI apps.

✅ API endpoints for integrating the Writer generative AI stack into apps or services, with Python and TypeScript SDKs.

Writer customers have launched hundreds of AI apps in beta, seeing real business value in days, not months.

If you're an org admin, go here to configure AI Studio for your account or check out our developer documentation here to learn more. Want a walkthrough first? Sign up for our webinar, June 25: The importance of accessible AI agent development in the enterprise



May 13, 2024

Add up to 100,000 words of sources to Ask Writer!

Ask Writer's source word limit is now 100,000 words instead of 5,000. Summarize long research papers, glean investment insights from company 10-Ks, and search through dense documents to find the answers you need.

April 18, 2024

Connect Knowledge Graph to Google Drive, SharePoint, and Notion

Connectors make it easy to keep your company's Knowledge Graph up-to-date and relevant. By syncing Knowledge Graph with your internal databases, you can ensure your team is working from the right source documents at all times. Learn more here.

April 17, 2024

New out-of-the-box agent: Video summaries

Need to promote your newest media appearance, full-length interview, or ad spot? Simply add your video to our new video summaries agent and we’ll generate a brief summary, bulleted takeaways, and social posts for LinkedIn, X, and Instagram.



P.S. This works on videos of any length between 30 seconds and two hours!

April 15, 2024

Access the power of Ask Writer anywhere!

Ask Writer is now available in the Writer for Chrome extension! No matter where you're working, you can generate content, summarize documents, and ask questions on the fly. All the Ask Writer features you love are available in the extension, including the ability to upload sources, create new sessions, and load prompts from the prompt library.

April 4, 2024

Share custom prompts with your team

Love the Prompt Library for Ask Writer but wish you could give it your own personal touch? Create and share frequently-used prompts with your team! Delete that Google Doc or Notion reference sheet – now users can access preapproved prompts in-app.

  • Team admins and org admins can add and manage prompts under Setup > Team prompts. They can also take a prompt they like from the Writer prompt library, edit as needed, and save to the team prompt library.

  • Select the view prompts icon: you can now switch between Team prompts and Writer prompts

  • Include variables and tags to provide extra context and easy searching

Learn more about team prompts here.

Create custom keyboard shortcut for Writer for Mac

You can now customize your keyboard shortcut to open the Writer for Mac app. Select the settings menu, then change the keyboard shortcut to the combination of your choice. Start with shift, control, option or command.

March 27, 2024

Yesterday we introduced the ability to calibrate custom voices for your company's unique writing style. Today you can rewrite text using your custom voices in Writer for Mac, Writer for WIndows, Writer for Figma, and Writer for Chrome!

March 26, 2024

Introducing voice: generate content in your company's unique writing style

Savvy brands know how important consistent brand and individual, shared voices are. With voice calibration, you can create outputs that sound just like you, faster. Voice allows you to build your different voices in Writer, and see them in action across the platform in the content you generate.

  • Upload sample copy and our specialized LLM will created a nuanced, accurate voice profile

  • Create a manual voice profile and adjust it until it's dialed in to your company brand

  • Use voice profiles across a variety of prebuilt and custom apps to deliver content that sounds right for your audience

  • Apply your profile to every output by default, ensuring consistency across your entire workforce, or create profiles for specific products, channels, audiences, or asset types

Learn more here.

March 18, 2024

Assign Writer licenses to billing groups

Billing groups allow Writer org admins to map users to internal budgets. Since each Writer user can be assigned to only one billing group, org admins can track the number of licenses used by each cost center. Learn more here.

March 15, 2024

Give context to flagged suggestions

Need to flag an incorrect suggestion? Now you can submit up to 250 words of commentary. This context will allow our developers to serve you high-quality suggestions, and we may share this feedback with account admins to help them improve the configuration of their style guide.

February 23, 2024

A picture's worth a thousand words: introducing Image analyzer, powered by Palmyra-Vision

Writer's new Palmyra-Vision model understands images, from photos to charts to infographics. Try it out using our new out-of-the-box app: Image analyzer

Using Image analyzer, you can describe, analyze, or generate content from images including photos, illustrations, infographics, and charts. 

You can give instructions like:

  • Generate alt text for this image.

  • In this chart, how many companies spent the same amount in 2019 and 2020?

  • Create a product description for this product line.

Check out our Help Center article for more ideas.

February 13, 2024

When you generate a transcript of a video using our recaps app, we'll make that transcript available on the left sidebar for download.

January 31, 2024

Our Writer for Mac extension is now responsive - use Ask Writer at any size!

Need a little more room when you're chatting with Writer on the go? Adjust the size of the Ask Writer window, hide or display the sessions menu, or go full-screen.

January 19, 2024

Generate content in 30+ languages

Palmyra, the Writer-built family of LLMs, now supports highly-accurate text generation and translation in over 30 languages!

  • Translate English content into another language

  • Translate non-English content into English

  • Use English-language prompts to generate non-English content

  • Use non-English prompts to generate content in the same language

Whether you're accelerating time to market with faster localization, supporting customers in a wider variety of languages, conducting research in other languages, or want to work in your native language when generating content, Writer now allows you to reach a global audience.

Learn more: Generating content in different languages

P.S. Not sure how to use these new technologies? Check out our Prompt Library and search for languages2024 to find 50+ new prompts showcasing our new polyglot powers.

December 19, 2023

Introducing the App Library!

Our directory of ready-to-use content generators has a new name and a fresh look: introducing the App Library!



The prebuilt features we used to call “templates” are now called apps and are stored within the App Library. All the apps you already know and love are there, but we’ve added new features to make it easier to navigate and discover new ways to use Writer.



Want to learn more? Take a tour! Check out our Quick Tip video in our Learning Center or check out our article Using apps.



December 11, 2023

Flexible security rules for Writer for Chrome

New rules allow admins to configure exactly when and where Writer for Chrome checks content:

  • Opt in or out by default

  • Create rules for specific domains, subdomains, or even specific pages

  • Use wildcard logic to create flexible rules

December 7, 2023

Rewrite text in Writer for Windows

Love our rewrite feature? Rewrite anywhere using the Writer for Windows desktop extension. Simply select Rewrite text, paste your text in the input field, and let Writer know what kind of rewriting it should do.

November 14, 2023

Rewrite text in Writer for Mac

Love our rewrite feature? Rewrite anywhere using the Writer for Mac desktop extension. Simply select Rewrite text, paste your text in the input field, and let Writer know what kind of rewriting it should do.

October 30, 2023

Use generative AI in Writer for Figma

Writer for Figma now generates content on the spot! Create error messages, zero state text, tooltips and more, then insert it directly into your frame.

Select the Commands tab, then let Writer know what you need. For example:

  • Generate tooltip text for clicking on a registration link for a health insurance plan. Use a professional tone with simple language.

  • Generate a 404 error message for when a user forgets to upload the document to the submission form

  • I'm a product designer. Help me come up with 5 ideas for copy for a button that a user clicks on to create a new listing for an available home.

Not sure where to begin? Check out the Starter ideas menu to explore what’s possible.

Want to learn more? Check out our Help Center article here.



October 20, 2023

Use generative AI in Writer for Chrome

When you're on a roll, the last thing you want to do is switch tabs. We’ve added generative AI capabilities to Writer for Chrome. Now you can generate content, break out of writer’s block, or rewrite that bit that doesn’t sound quite right — no matter where you’re working.

Select the purple Generate content icon to open the widget, then let Writer know what you need. For example:

  • Write me a paragraph about the use of artificial intelligence in medicine

  • Write an outline for a blog post about purchasing certificates of deposit

  • Generate a 404 error message for when a document is missing from a submission form

  • Compose an email subject line for a prospective client on benefits of refinancing their mortgage this month

Want to learn more? Check out our Help Center article here.

October 6, 2023

Use Ask Writer in the Writer for Mac extension!

Our new Ask Writer chat interface is now available in the Writer for Mac extension! Just as you can do with the desktop experience, chat back and forth, add sources, and ask analytical questions no matter where you’re working. Install the extension here. (P.S. Already have the extension installed? Restart to see the new update.)

September 29, 2023

Introducing Writer for Windows

Generate content from Writer anywhere using our new Windows desktop extension! Using our new extension, you'll be able to brainstorm new content, escape writer's block, and generate fresh ideas for whatever you're working on, no matter where you're writing. Learn more about the Writer for Windows extension here.



P.S. Looking for more information about our Mac OS desktop extension? Learn more here.



September 27, 2023

Introducing the new Ask Writer!

Our most popular app just received a huge upgrade! Ask Writer is still the open-ended content generator you love, but we've made it more flexible and powerful with a chat interface, the ability to upload files, and the power to handle new types of analytical tasks. It's not just a writing companion - it's a research assistant! We've also updated our Prompt Library to help you explore new Ask Writer possibilities - check out the Summarizing, Analyzing, and Transforming pages!

Learn more about the new Ask Writer experience here.

September 19, 2023

Improved punctuation suggestions

Our spelling and grammar suggestions are more robust thanks to a supercharged punctuation update. Writer now handles poorly formatted contractions, missing commas within lists, unnecessary commas, and more.

September 7, 2023

Access live and on-demand webinars in-app

It's easier than ever to discover upcoming webinars and view our on-demand catalog. Our new Webinars page allows you to register for live sessions and watch recorded sessions within our Learning Center.

August 25, 2023

Check out the new Writer Prompt Library 📚

Not sure how teams like yours use Writer? Want to try out a new use case, but you're not sure how to tell Writer what you need? Brushing up on your prompt-crafting skills? Introducing our new Prompt library, with 150+ ready-to-use prompt templates!

  1. Select the Writer Prompt Library button within Ask Writer to access the library

  2. Select Use to insert a prompt into Ask Writer

  3. Adjust any text within [[brackets]]

  4. Select Generate

August 21, 2023

Generate content from text & improved rewrite commands



  • Highlighting text to rewrite it now generates multiple options, with a larger display for easier browsing. Select the checkmark to replace your highlighted text, or select copy to add the suggestion to your clipboard.

  • Highlight text - then generate content from it! Turn your selection into a headline, a frequently asked question, a LinkedIn post, and more.

Commands are available in the Editor and the Writer for Mac extension.



July 14, 2023

Introducing Writer for Mac 👩‍💻

Generate content from Writer anywhere using our new MacOS desktop extension! Using our new extension, you'll be able to brainstorm new content, escape writer's block, and generate fresh ideas for whatever you're working on, no matter where you're writing. P.S. If you're part of our Knowledge Graph beta, you'll even be able to ask your Knowledge Graph a question!

July 12, 2023

Commands menu

When you're on a roll, the last thing you want to do is switch tabs! Now, you can generate content, break out of writer's block, or rewrite content right from within the Editor using our new commands menu.

July 11, 2023

More 💪 powerful rewrite

We've made our rewrite feature better than ever! Just like before, highlight text and click on the (new and improved) icon which appears to open the rewrite menu. We've introduced two new rewrite options:

  • Rephrase to reword the same content a little differently

  • Modify tone to use a different voice to express your content

We've also added the ability to keep writing from the rewrite menu.

Multi-factor authentication

Keep your Writer account 🔐 locked down. Prevent unauthorized users from accessing your Writer account by requiring an additional code via email or SMS.

Domain discoverability

Make it easy for other members of your organization to find your Writer workspace. When new employees sign up using a specified email domain, we'll suggest your workspace so they can join their colleagues!

June 22, 2023

Keeping things simple

Generative AI is at the very core of our mission to scale great writing across every team. With that in mind, we're no longer using the term "CoWrite" in reference to our AI-powered apps - they're simply "apps" now! We made a few more subtle changes:

  • Our open ended "Ask Writer Anything" content generator is now simply "Ask Writer"

  • We will no longer capitalize terms, snippets, or suggestions

  • We will no longer capitalize rewrite, highlights, or claim detection

  • The style guide is now two words

"How did you coordinate and communicate these changes across the company?"

You know the answer: we updated our style guide with new terms!

June 15, 2023

Use carefully terms

FYI: Team and Enterprise

You can now create Use carefully terms! These are useful when your team should only use a term within certain, specific contexts. We'll flag any use of this term so you can double-check to see whether you're using it appropriately. Learn more about terms here.

March 23, 2023

Recaps

FYI: Team and Enterprise

The Recaps builder is live for Team and Enterprise accounts! Now you can automatically surface high-level takeaways and key quotes from an audio or video file, or YouTube URL. 

Use the Recaps builder when you have a podcast, webinar, or other long-form audiovisual recording that you want to summarize or repurpose into a written format. The builder will generate key takeaways, with a brief summary and relevant quotes for each takeaway. You can also use the output as a starting point for a blog post, thought leadership piece, or other type of long-form written content.


February 1, 2023

Google Docs support in ReWrite

FYI: Team and Enterprise

Did you know? The Writer Chrome extension supports Google Docs. Highlight a sentence or a paragraph and instantly generate a rephrased version that's briefer, simpler, more fluent, or more complex. Learn more about how to use ReWrite here.


January 18, 2023

Claim detection

FYI: Team and Enterprise

Large language models are trained to recognize and reproduce linguistic patterns, but they are not trained to recognize the truthfulness of the content they produce. So occasionally, Writer will sometimes produce quotes, anecdotes, or statistics that need to be fact-checked by a human.

With the new claim detection feature, content that might need to be fact-checked will be automatically highlighted so you can more easily identify, verify, and edit (if necessary) any potentially problematic claims. Just click the claim detection mode button while in the editor to highlight any claims that Writer can't verify.


December 21, 2022

Ask Writer's AI anything: now supporting links ⚓

FYI: Team and Enterprise

CoWrite just got a major upgrade: now, it can browse the web for you. If you provide additional context with links, Writer’s AI can crawl those pages to give more sophisticated responses.

Just describe what you want to write, and Writer’s AI will write new content from scratch, answer questions, summarize longform content, surface insights from the web, or rewrite copy in a different style. Here are just a few prompts you could try with the new link support:

  • Summarize this article into 3 takeaways: [insert URL]

  • Write a marketing email promoting this blog post: [insert URL]

  • Explain what this company’s main differentiators are: [insert URL]

Snippets importer

FYI: all users

You can now upload Snippets in bulk with the new Snippets importer flow! Drag and drop a CSV file to build out your Snippets library more quickly. 


December 2, 2022

Keep writing (beta)

FYI: Team and Enterprise

Team and Enterprise accounts now have beta access to a “Keep writing” button in the Editor. Use it to answer questions or requests, complete unfinished sentences, or riff on partially formed ideas.

To try it out, select the Keep writing button (at the top of the editor, with the lightning bolt ⚡️), or use a keyboard shortcut (Cmd + Return for Mac, Ctrl + Enter for PC). Wherever your cursor is, CoWrite will then automatically generate words that could logically follow given the previous input.


November 14, 2022

FYI: Team and Enterprise

Magic links is now live! Linking your content manually can be a painful and time-consuming process. With magic links, you can quickly find and add internal links from your most important websites.

To get started, connect your domain (e.g., writer.com). Then, in the Editor, activate the magic links panel. Highlight the keywords you’d like to link. You’ll see suggested links appear — click to accept, and your keyword phrase will be hyperlinked wherever it appears in your doc.

Other notes on magic links:

  • Magic links is only available for Team and Enterprise plans.

  • Only org or team admins can set up magic link domains.

  • Each team is limited to 1 domain.

You can learn more about magic links in this article.

FYI: all users

To support the launch of magic links, we've also updated the hyperlink UI! Clicking on a hyperlink will bring up the options to edit the hyperlink or display text, remove the link, and open the link in a new tab.


October 21, 2022

Editor UX improvements

FYI: All users

We launched Editor nav improvements, an updated formatting toolbar, and new app guide tooltips! Our new Editor organization should 1) improve discovery of our new NLG features, 2) provide a clean UX foundation for the new features we intend to add, 3) improve overall legibility, and 4) help users find new app-related educational materials! 

Improvements:

  • We increased the font size for the Editor text and Doc title text

  • The new formatting toolbar is fixed to the bottom of the Editor instead of appearing on text highlight

  • It includes new options such as quote blocks, code formatting, text alignment, H3s, etc

  • We completely removed the nav buttons you used to see hugging the left side of the Editor… and we sunsetted the docs sidebar

  • Last saved time and author details are now found in the ellipses menu next to the Doc title


September 30, 2022

Enterprise API

FYI: Enterprise

We've added two new Enterprise API endpoints for CoWrite to support batch generating content! 

Check out our API docs here. 


September 23, 2022

Highlights

FYI: Team and Enterprise

Generate Highlights based on the content you're currently working on in the Editor! Select the Highlights button to instantly generate a package of meta description, social media posts, and summary-style highlights. Just wait a few seconds and your highlights will appear.

  • Highlights is available for Team and Enterprise plans

  • Words generated by Highlights count towards the overall words generated limits

  • Highlights are available for content between 250 words and 2,000 words

  • Highlights can be run on CoWrite-generated content or your own content


September 22, 2022

Rewrite in Chrome extension

FYI: All users

Something exciting has happened! ReWrite is now available on Chrome extension! You can now ReWrite anything and everything — okay, not everything... yet, but see the list of sites we support below and test it out.

  • Articulate Rise

  • Coda

  • Confluence

  • Dropbox Paper

  • GatherContent

  • Gmail

  • Google Calendar

  • Helpscout

  • Jira

  • LinkedIn

  • Medium

  • Notion

  • Outlook online

  • Outreach

  • Slack web

  • Tettra

  • Twitter

  • WordPress

  • Zendesk

Learn more on how to use ReWrite here. 


September 15, 2022

Snippets / Terms improvements

FYI: All users

More improvements for Snippets and Terms? Yup, that's right. 

  • Launched UI/UX improvements to the Snippets card in the Snippets tab. This includes showing the entire Snippet w/scroll, showing only Description in the overflow “more” dropdown, and showing tags

  • Added filtering by tags on Snippets and Terms pages in the Writer Editor

  • You can now insert a snippet via shortcut in the Editor


August 2, 2022

Public launch of CoWrite

FYI: All users

CoWrite is out of closed beta and available to Enterprise customers!

Read more about Cowrite:

Updates made as part of the launch:

  • Launched the new SEO blog post builder! You can now build an entire blog starting with just a headline in one easy flow

  • You can now favorite a template in the CoWrite template library

  • We increased the width of regular templates, so you have more room to add your inputs

  • We added a "words generated" usage counter to the Billing page, so org admins can keep track of usage


July 29, 2022

Soft launch of ReWrite

FYI: All users

ReWrite had been available as a Closed Beta. Now we're soft launching it to our Team and Enterprise customers!

The latest updates include: 

  • Redesigned the ReWrite widget to be cleaner, smaller, and vertically resizable

  • Added "Shorten" as a new ReWrite option. Shorten helps you drastically slim down the length of your content.

  • Ability to see more than one suggestion at time and load more

  • We now remember the last ReWrite option you used, so the next time you open it in that Doc, we’ll start with that one

  • We now highlight in green the new words added in the rewritten text

Read more about ReWrite.


July 20, 2022

FigJam support

FYI: All users

As always, we're working on improvements for our Figma plugin. We now support FigJam for you Figma lovers! 

Side note: we also added the ability to resize the sidebar in case it's in the way! 


June 24, 2022

Enterprise API and service creation

FYI: Org admins

We’ve launched the first version of our Enterprise API. Org admins can create "service accounts" on the Account page, and then generate an API token.

We’ve also published new developer docs outlining our current endpoints.

For now, we support get Styleguide pages and list of users. Adding more endpoints across the next few weeks! 


June 10, 2022

New CoWrite templates

FYI: Closed Beta

We've got some brand new / updated templates for you to try out!

  • eCommerce product descriptions

  • FAQ

  • Blog headlines (given an existing headline, comes up with 10 alternatives)

  • eCommerce marketing email

  • Email subject line

  • Job post


June 9, 2022

Contentful plugin

FYI: All users

You can now use Writer in Contentful! Writer for Contentful is an app available in the Contentful Marketplace for anyone with a Contentful account. You'll need a Writer account to use the app. 

With the Writer app, you can make sure everything that you write in Contentful is clear, consistent, and error-free.

If you’re on a Pro, Team, or Enterprise plan, this includes advanced suggestions like style, clarity, delivery, inclusivity, and terminology checks. Free users will only receive spelling, punctuation, and grammar suggestions.

Learn more on how to install the app here.


May 20, 2022

Global search on published Styleguides

FYI: All users

We now offer global search on all published Styleguides. Search is super speedy, and users can look for keywords across pages, published Terms or Snippet tables, or even inside Do/Don’t boxes.


May 20, 2022

ReWrite in Closed Beta

FYI: Closed Beta

ReWrite is now out in Closed Beta! 

What is ReWrite? 

With ReWrite, users can highlight text (minimum 5 words) in the Editor and rephrase it. We currently have 3 ReWrite options:

  • Simplify: reduce complexity

  • Improve fluency: fix ESL-like errors with fluency, grammar, spelling, punctuation

  • Enrich: enhance the sentence with more description and details

If interested, reach out to your CSM for more information! 


May 18, 2022

Custom template request form

FYI: Org admins

We launched a CoWrite custom template request form, so beta users can directly request new templates from the app. Tell us what you want! 


May 18, 2022

Snippets upgrades

FYI: Org admins

Some performance updates for those using our Snippets! 

Improvements

  • We now support extremely large Snippets libraries — basically that means we can support all of your Snippets, even if you have 10k Snippets!

  • We have improved Snippets search:

    • It is no longer case sensitive

    • You can search on partial matches, all fields, and formatted text

    • It’s still super speedy

Note: we'll be upgrading the Snippets sidebar soon to include the above improvements.


May 18, 2022

Terms importer

FYI: Org admins

Terms users can now bulk upload new Terms via CSV or XLSX. To make it easy, use the upload template provided in the import flow. We support every Term field/toggle option. However, note that we currently only support adding new Terms, not updating existing Terms.

For more details, check out our help article!  


April 7, 2022

OKTA SCIM

FYI: Org admins

Okta SCIM setup page is now live! Enterprise orgs with Okta SAML set up will now see an option to set up Okta SCIM. Just head to Admin > Single sign-on > Set up Okta SCIM. This feature helps organizations more easily onboard and manage their users in Writer.


March 31, 2022

Figma added to our user activity report

FYI: Org admins

Have you heard? We've made a small tweak to our user activity report to allow admins to track Writer usage within Figma! Take a look in your instance today :) 


March 23, 2022

Bulk invite users to multiple teams

FYI: Org admins

Guess what?! Enterprise admins can now invite users to multiple teams at once! This will save you time out of your day as you're trying to get your team all set up in Writer. 

In the invite popup, the Teams dropdown is now a checkbox, so admin users can select more than 1 Team at a time.


March 4, 2022

Spelling suggestions improvement

FYI: All users

We've launched an updated version of our in-house spelling model, courtesy of our amazing team! We're constantly refining our model to account for the dynamic needs of business domain writing.

We're reducing spelling mistakes one word at a time! 


February 15, 2022

Apps page with Figma plugin

FYI: All users

Check out our new Apps page. We also added a new tile for our Figma plugin, which got a major refresh yesterday!


February 15, 2022

In-app beacons

FYI: All users

We’ve launched in-app help beacons, aka "Instant Answers" so that you can now browse, search for, and read/watch our new help center articles & videos directly in the app. Over time, we plan to add more functionality, such as live chat and email support. Get excited - there's more to come! 


February 15, 2022

Help center

FYI: All users

Excited to announce that we've launched a new version of our Help Center. What this means for you — more articles, guides, and videos to come!


February 15, 2022

Figma plugin improvements

We've released an improved version of our Figma plugin! You'll notice a refreshed design, along with more robust functionality. 

Improvements

  • You can now check frames, text nodes, and components at any time. Before, we only supported either frame or text node depending on your settings.

  • If you already have a frame or text layer selected and you launch Writer, you'll no longer have to reselect the frame/text layer to see Writer's suggestions.

  • The sidebar now shows complete Suggestion category names instead of abbreviated versions.

  • If no layer is selected at all, you'll now see the home screen.

  • We also improved performance and refreshed the design of the home screen, sign in, and settings screens.

For more info, read our help article on how to install and use Writer for Figma.


February 8, 2022

Terms upgrades

Terms has gotten a serious upgrade!

We're excited to announce a refreshed design for adding and editing Terms. You'll be able to navigate between Terms much more quickly. We also now support auto-save as you make changes. 

In addition, we now support improved functionality: 

  • Don't use terms can have suggested replacements — pick up to 3 Approved Terms as replacements.

  • For case sensitive terms, you'll get automatic corrections for any wrong capitalizations Writer finds

  • You can add duplicate terms as long as they are different parts of speech

  • You can separately enable/disable Approved Term highlighting and Common Mistake suggestions

  • Pending terms can have common mistakes and examples

  • Don't use terms can have examples


January 19, 2022

New Single Sign-on Setup flow (SAML) is live! 

FYI: Org Admins

We released a new React-based version of our SAML setup flow for Team and Enterprise orgs. This new flow is more user-friendly, faster/more stable (as it’s in React), and more accommodating for different SAML Identity Providers. Users also now have the option to both edit and delete existing SAML configurations.


January 17, 2022

Rich text formatting in Snippets

Got text you’re always retyping or copy/pasting across emails and chat? Add it as a Snippet so you can insert it anywhere with a simple shortcut.

And, even better, Snippets now support formatting, including hyperlinks, bullets, lists, bolding, and italics. If the text area you're writing in supports formatting, your specified formatting will now show up once you insert or paste in the Snippet.